仪器网(yiqi.com)欢迎您!

| 注册2 登录
网站首页-资讯-专题- 微头条-话题-产品- 品牌库-搜索-供应商- 展会-招标-采购- 社区-知识-技术-资料库-方案-产品库- 视频

问答社区

马弗炉muffle furnace的信息翻译。。。

继续几个发酒 2010-08-24 18:04:09 428  浏览
  • 我不知道到底是放在英语分类还是工程技术更合适。。。 MUFFLE FURNACE SPECIFICATION FEATURE The furnace should be designed and fabricated to suit various IS & ASTM standard application in Industrial and Metal treatment. a) Temperatur... 我不知道到底是放在英语分类还是工程技术更合适。。。 MUFFLE FURNACE SPECIFICATION FEATURE The furnace should be designed and fabricated to suit various IS & ASTM standard application in Industrial and Metal treatment. a) Temperature upto 1200 degree Celsius . b) The proportional digital temperature controller with an accuracy +/- 3 degree Celsius. SPECIFICATION Chamber volume : 4.25ltrs. Internal size : 25 x 13 x 13cms External size : 47 x 38 x 38cms Range : upto 1200 degree Celsius. Accuracy : +/- degree Celsius of set value. Heat up time : 60 min. upto 1200 +/- 3 degree Celsius without load Controller : digital display electronic controller Scensor : CR/AL Thermocouple Internal chamber : Silimenite muffle. External : mild steel powder coated Insulation : ceramic wool Heater element : Kanthal Al Door brick insulation : HFK bricks Safety device : energy regulator or blind controller PID control : micro processer based PID controller Timer : On/Off cycle Solid state fuse : electronic solid state fuse Air circulation ; Venture injector at back as per ASTM Capacity (watts) : 2250 Power consumption : 10Amps Electronic requirement : AC 230V & 50Hz cycle NOTE : - Manual should contain details instruction of operation, technical specification, circuit and component layout diagram. - Manual book : 2nos 展开

参与评论

全部评论(1条)

  • gnqcusow 2010-08-25 00:00:00
    嘿嘿...给我分吧?

    赞(5)

    回复(0)

    评论

热门问答

马弗炉muffle furnace的信息翻译。。。
我不知道到底是放在英语分类还是工程技术更合适。。。 MUFFLE FURNACE SPECIFICATION FEATURE The furnace should be designed and fabricated to suit various IS & ASTM standard application in Industrial and Metal treatment. a) Temperatur... 我不知道到底是放在英语分类还是工程技术更合适。。。 MUFFLE FURNACE SPECIFICATION FEATURE The furnace should be designed and fabricated to suit various IS & ASTM standard application in Industrial and Metal treatment. a) Temperature upto 1200 degree Celsius . b) The proportional digital temperature controller with an accuracy +/- 3 degree Celsius. SPECIFICATION Chamber volume : 4.25ltrs. Internal size : 25 x 13 x 13cms External size : 47 x 38 x 38cms Range : upto 1200 degree Celsius. Accuracy : +/- degree Celsius of set value. Heat up time : 60 min. upto 1200 +/- 3 degree Celsius without load Controller : digital display electronic controller Scensor : CR/AL Thermocouple Internal chamber : Silimenite muffle. External : mild steel powder coated Insulation : ceramic wool Heater element : Kanthal Al Door brick insulation : HFK bricks Safety device : energy regulator or blind controller PID control : micro processer based PID controller Timer : On/Off cycle Solid state fuse : electronic solid state fuse Air circulation ; Venture injector at back as per ASTM Capacity (watts) : 2250 Power consumption : 10Amps Electronic requirement : AC 230V & 50Hz cycle NOTE : - Manual should contain details instruction of operation, technical specification, circuit and component layout diagram. - Manual book : 2nos 展开
2010-08-24 18:04:09 428 1
什么是马弗炉,高温马弗炉,什么是马弗炉
 
2018-12-09 15:09:49 337 0
马弗炉
我的马弗炉刚开始的时候指示灯还闪,工作一会儿后就不闪了,但是温度还在上升,这是什么情况?
2023-11-19 19:45:27 308 0
马弗炉的用处?
 
2011-12-16 12:55:50 359 2
马弗炉的介绍
 
2018-11-20 16:23:22 516 0
马弗炉的注意事项
 
2016-06-24 21:25:11 419 1
马弗炉的使用方法
马费炉的创始人是谁你知道吗、、、
2012-03-02 13:39:41 440 2
马弗炉的问题
马弗炉在加热的时候,如果设定的Z高加热温度是500度,升温时间为五小时,恒温时间也是五小时,但设定之前炉内的温度就已经是三百度了,请问在加热到500度时所花的时间是两个小时或者还仍然是五个小时?如果所花的时间是两小时的话,那么恒温的时间是否会变长... 马弗炉在加热的时候,如果设定的Z高加热温度是500度,升温时间为五小时,恒温时间也是五小时,但设定之前炉内的温度就已经是三百度了,请问在加热到500度时所花的时间是两个小时或者还仍然是五个小时?如果所花的时间是两小时的话,那么恒温的时间是否会变长或者还是不变?谢谢。 展开
2018-11-28 08:56:49 391 0
国产马弗炉与进口马弗炉的区别是什么?
 
2011-06-24 00:49:18 563 6
一体式马弗炉哪家好,智能马弗炉哪家好,马弗炉品牌
 
2018-11-23 14:17:08 381 0
地球的信息
 
2006-12-28 07:25:26 473 3
翻译翻译,请高手帮我翻译一下这个说明
Followthesysteminstallationinstructionscarefullyandinthespecifiedorder.ThesoftwaremustbeinstalledonthecomputerbeforeconnectingtheUSBcable.2.1FacilitiesRequirementsFacilit... Follow the system installation instructions carefully and in the specified order. The software must be installed on the computer before connecting the USB cable. 2.1 Facilities Requirements Facilities requirements for the alpha-SE system are listed in Table 2-1 and the system dimensions are given in Fig. 2-1. As shown in Fig. 2-2, the alpha-SE tool requires a clear work area of 20 by 18 inches (500 by 460 mm), excluding the operator computer. 2.2 Unpacking the Hardware Opening the Shipping Container Move the alpha-SE shipping container to the area where the tool will be installed. Open the container and remove the top and side pieces of packing foam. Carefully remove all smaller components from the shipping container, verifying that you received all components, as shown in Fig. 2-3. Finally, remove the alpha-SE ellipsometer and position it on your clear 20” by 18” (510 by 460 mm) workspace. Caution: The alpha-SE ellipsometer without sample chuck weighs approximately 37 lbs. (16 kg.). Please find an assistant to lift the alpha-SE unit out of the shipping carton and on to clear work surface. 展开
2008-06-22 06:30:36 855 4
关于马弗炉使用的一下问题,马弗炉大师请进!
马弗炉在额定温度下(比如1200)Z多能加热多长时间?试块的烧结时间不包括升温时间和冷却时间吧?请问烧结结束后冷却时要怎么冷却?断掉电源一直等到没温度了再开炉门拿试块吗?烧结试块时炉内放多少试块合适?试块大约占到炉容积的多少?
2013-08-20 18:05:01 690 1
马弗炉行业标准
我们设备有一个控温的通道,5个监测的通道,监测通道温度与控温通道在250度时差60度,这个符合行业的标准吗?
2018-12-02 05:58:32 436 0
马弗炉的原理是什么
 
2008-08-19 08:37:15 442 2
德语翻译,关于注塑机上的一些语句的翻译
1,KraftEinspritzen,2,KraftAufdosieren3,max.KraftSchneckenrückzug,4,-AufdosierenSchneckedreht,Axialkraftliegtan;SchneckekannzuBeginnauchohneAxialkraftdurchdrehen5,-E... 1,Kraft Einspritzen, 2,Kraft Auf dosieren 3,max. Kraft Schneckenrückzug, 4,- Aufdosieren Schnecke dreht, Axialkraft liegt an; Schnecke kann zu Beginn auch ohne Axialkraft durchdrehen 5,- Einspritzen Schnecke wird mit max. Spritzkraft vorgeschoben, keine Drehbewegung, 6,- Intrudieren Schnecke dreht im Stand, Kraft Aufdosieren (Material wird nachdosiert u. somit eingespritzt), wird sehr selten angewendet 7,- Schnecke entleeren Schnecke dreht ohne Axialkraft (Nullbelastung) 8,- Schneckenrückzug Schnecke dreht nicht, negative Axialkraft; -->Pendelrollenlager "hebt ab" (Negativbelastung) und Kegelrollenlager wird belastet 展开
2016-10-23 02:35:39 474 1
什么是马弗炉?马弗炉相关术语解释

马弗炉是一种通用的加热设备,呈箱式,电阻丝藏于箱体中,箱体壁厚,内有保温材料,温度可升至1200度,常用于马弗炉碱融某些难溶金属及矿物质,以及重量法分析中,将滤纸无焰灰化、灼烧分解有机物、驱赶无机物中可挥发成份等。

 

产品应用范围为

 

(1)热加工、工业工件处理、水泥、建材行业,进行小型工件的热加工或处理。

(2)医药行业:用于药品的检验、医学样品的预处理等。

(3)分析化学行业:作为水质分析、环境分析等领域的样品处理。也可以用来进行石油及其分析。

(4)煤质分析:用于测定水分、灰分、挥发分、灰熔点分析、灰成分分析、元素分析。也可以作为通用灰化炉使用。

 

马弗炉相关术语解释

 

(1) 过程变量。在过程控制中,过程变量是指需要控制或检测的物理量,如温度控制中的温度、压力控制中的压力、流量控制中的流量等都属于过程变量。


(2) 硅钼棒。硅钼棒阻性电热元件,以二硅化钼为基础制成,耐高温、抗氧化的。在高温氧化性气氛下使用时,表面生成一层光亮致密的石英玻璃膜,能够保护硅钼棒内层不再氧化,硅钼棒元件具有独特的高温抗氧化性。


(3)设定值。设定值又称设置点或给定值,是控制器实时控制过程变量的目标值,也就是程序编程值,常用SP或sv表示。

(4)正向作用。实测值PV与设定值SP比较,当在PV   SP时,控制输出量增加,就是控制器的正向作用。正向作用通常用于制冷控制。

(5)比值控制。比值控制是指有两路控制输人量的情况下,控制量是两者的比率。例如燃气炉控制,为了获得高的燃烧效率,燃气和空气的需要保持一定的比率。

 

(6)实际值。实际值又称实测值,是控制器测量到的,被控对象过程变量的实时变化值,常用Pv表示。在程序控制中,过程变量的实际值要跟随设定值变化。

(7)反向作用。实测值PV与设定值SP比较,当在PV   SP时,控制输出量增加,就是控制器的反向作用。反向作用通常用于加热控制。

 

(8)控制回路。控制回路是指控制器完成一个过程变量的控制,所包含的全部闭环控制环节。


2021-12-02 14:58:07 1000 0
蛋白质的分类信息
 
2018-12-08 16:44:35 350 0
电子负载的其它信息
 
2018-12-05 02:23:14 455 0
拉曼光谱的相关信息
 
2018-11-29 11:41:15 312 0

1月突出贡献榜

推荐主页

最新话题