Guthrie,Young,Blankenagel,andCooley1ABSTRACTInordertoavoidearly-agedamagetocement-treatedbase(CTB)materials,thecementmustbeallowedtocureforaperiodoftimebeforethepavementc... Guthrie, Young, Blankenagel, and Cooley 1
ABSTRACT
In order to avoid early-age damage to cement-treated base (CTB) materials, the cement must be
allowed to cure for a period of time before the pavement can be opened to traffic. The purpose
of this research was to evaluate the utility of the soil stiffness gauge (SSG), heavy Clegg impact
soil tester (CIST), dynamic cone penetrometer, and falling-weight deflectometer for assessing
early-age strength gain of cement-stabilized materials. Experimentation was performed at four
sites on a pavement reconstruction project along Interstate 84 in Morgan, Utah, in which cement
stabilization was used in conjunction with full-depth recycling. Each site was stationed to
facilitate repeat measurements at the same locations with different devices and at different curing
times. Because of the considerable attention they have received in the pavement construction
industry for routine quality control and quality assurance programs, the SSG and CIST were the
primary focus of the research. Statistical techniques were utilized to evaluate the repeatability of
these devices and their sensitivity to curing time. The results indicated that while the SSG was
more repeatable at one site, the CIST data were markedly more sensitive to curing time than the
SSG data at all of the cement-treated sites during the first 60 hours after construction. For this
reason, the data suggest that the CIST offers greater overall utility than the SSG for monitoring
early-age strength gain of CTB. Further research is needed to investigate appropriate thresholds
and protocols for these testing methods that ensure adequate reliability of the collected data.
Key Words: Cement Stabilization, Clegg Impact Soil Tester, Dynamic Cone Penetrometer,
Early Trafficking, Falling-Weight Deflecometer, Soil Stiffness Gauge
TRB 2005 Annual Meeting CD-ROM
英语翻译《名企核心人才培养管理笔记》 没有逐字翻译,如果是书名的话,感觉英文里 笔记一词 如果加进去感觉
The scheduler function involves planning how to produ
The X-ray diffraction (XRD) pattern was obtained on a
试管 test tube 试管架 test tube holder漏斗 funnel 分液漏斗 separ
The radial resolution of multiple echoes ( Rres ) mea
灯丝 [词典] filament [例句] 灯丝烧掉了。 The filament has burnt ou
monomer 英['mɒnəmə] 美['mɒnəmə] n.
gas mask
protective mask 英 [prəˈtektiv mɑ:sk] 美 [prəˈtɛktɪv m
UNIPHOS-400 multiparameter UV/IR based Fire Detector