Arcing Test (method B):
Implementation of standards: UL 1703-2015
A single module or panel is to be used with a separate power supply as described in following:
The power supply is to be a constant voltage supply with a series connected current-limiting resistor. The parameters of the total system are to be as follows:
a) Open-Circuit Voltage The voltage that is across the fracture during normal use of the modules or panels with the specified bypass diodes.
b) Short-Circuit Current Not less than 80 percent nor more than the rated module or panel short-circuit current, when the current-limiting resistor is adjusted so that the voltage across the module or panel being tested is zero.connected in series to provide the remainder of the source. The module or panel under test is to be irradiated at 80mW/cm2 or more at 20°C~30°C. The system load is to be a short circuit.
报价:¥100000
已咨询1721次光伏组件(UL 1703)测试项目
报价:¥18000
已咨询810次NDH-B-耐电弧试验仪
报价:¥16113
已咨询72次50KV-高压电弧烧蚀试验仪
报价:¥16115
已咨询74次50KV-高压电弧烧蚀试验仪
报价:¥38000
已咨询120次BDH-20KV计算机控制耐电弧试验仪
报价:面议
已咨询108次BDH-20KV计算机控制耐电弧试验仪
报价:¥38000
已咨询123次BDH-20KV计算机控制耐电弧试验仪
报价:¥4800
已咨询601次NDH-B-耐电弧试验仪